KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
' style=
Date:  1-25-2007
Number of Hours:  6.25
Manual Reference:  7-6
Brief Description:  Left wing tank preparation

After being away for two weeks at Boeing in Seattle taking the B-777 training I continued on the left wing fuel tank preparation. First I contersunk the tank aft bulkhead rivet holes, see image 1.
Then I turned to the tank inboard bulkhead. I installed the access panel retaining ring and anchor nuts, the fuel pickup tube, fuel pickup tube anti-rotation bracket, fuel tank vent line line fitting and BNC connector (for the fuel quantity indicating system). Then I made the vent line and installed the snap bushings in the ribs that the vent line passes through, see image 2. Finally I installed the mounting hardware on the fuel quantity indication system capacitance plates, see image 3.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.